Cookie choices

Nothing optional runs on this site. You can see this again from “Cookie settings” at the bottom of every page.

Essential

Always on

Keeps the site working and secure, remembers this choice, and keeps you signed in if you sign in.

Cookies
  • rf-consent · This site · 12 months
    Remembers your cookie choice (browser storage).
  • refariUserSession, RefariLoggedIn · Refari · 1 year
    Keeps you signed in when you sign in to a Refari feature.
  • refari_jb_registered · Refari · Until you close the tab
    Remembers that you have just registered (browser storage).
Permit to work alongside an as-fitted MGPS drawing

Services

Drawings, Design & Specifications

A vital requirement for your APs to be able to manage your MGPS safely and efficiently, especially during shutdowns and emergencies.

OxygenNitrous oxideEntonoxMedical airSurgical airVacuumAGSS

As a requirement of HTM02-01 and the Pressure System Safety Regulations, up-to-date drawings and records are required.

A

Drawing Services

We can provide some or all, of the following to enhance and complete your drawings, or start completely from scratch:

  • Systems survey, mark-up and update existing drawings
  • Full site survey and production of As-Fitted Drawings
  • Produce Schematic Drawings
  • Produce Isometric Drawings, Flow and Pressure drops
  • Apply “Traffolyte” engraved labelling to each AVSU and accessible line valve and compile a valve log

MGPS Drawings will be completed using industry standard blocks and symbols, contain the required details, be suitable layered and where required valves will be renumbered into one style and a complete valve log produced. Traffolyte style engraved labelling can be fixed to every AVSU if required.

B

Design & Specifications

We can provide design or validation of design services to ensure your system meets the current HTM02-01 and clinical needs. This can include some or all but is not limited to the following:

  • Site survey for siting of VIE or new Plant
  • Compound, Plant and Manifold room requirements
  • MGPS Flow calculations and pipe sizing
  • Source equipment sizing and specification
  • Main, Ready to use and Local cylinder storage
  • Installations and maintenance requirements
Bulk liquid medical oxygen VIE and vaporisers